1. Define the operating requirement
State which areas and applications are in scope, who will use the systems and what must remain available during the works. Include drawings, known defects and the intended expansion.
FOSS procurement guide
Compare infrastructure proposals on the same scope. Use this checklist to prepare a project brief for fiber, cabling, security, networks, data centers and AV in the UAE.
State which areas and applications are in scope, who will use the systems and what must remain available during the works. Include drawings, known defects and the intended expansion.
For fiber, agree loss-budget and OTDR records where required by the design. For copper, define the installed-link test criteria. For CCTV and networks, describe the operating scenarios, coverage and performance to be demonstrated.
Ask each bidder to separate survey, materials, installation, configuration, testing, training and support. Identify exclusions, provisional quantities, third-party dependencies and any approvals that must be verified for the project.
List the drawings, labels, asset schedules, configuration backups, test results, warranty documents and operator instructions the owner needs. Name the person who will accept each deliverable.
If the condition or scope is uncertain, start with an infrastructure assessment. If drawings, quantities and acceptance criteria are established, send an RFQ or tender reference for a scoped proposal.
Scope of work
The scope can include site address and marked-up drawings; system list and available boq; existing asset and test records; user capacity and operational constraints; target dates and access windows; budget range and decision process. Final inclusions depend on the site survey, design and agreed proposal.
Send the site location, drawings or BOQ, existing-system information, project stage, indicative budget and target date. Identify any live operations or restricted access. FOSS can discuss an assessment when the scope is not yet defined.
Project desk
Share your tender reference, BOQ, site details or operational challenge. We will review the appropriate technical and commercial path.