FOSS procurement guide

ICT & ELV Project Planning Checklist

Compare infrastructure proposals on the same scope. Use this checklist to prepare a project brief for fiber, cabling, security, networks, data centers and AV in the UAE.

1. Define the operating requirement

State which areas and applications are in scope, who will use the systems and what must remain available during the works. Include drawings, known defects and the intended expansion.

2. Specify evidence, not only equipment

For fiber, agree loss-budget and OTDR records where required by the design. For copper, define the installed-link test criteria. For CCTV and networks, describe the operating scenarios, coverage and performance to be demonstrated.

3. Make proposals comparable

Ask each bidder to separate survey, materials, installation, configuration, testing, training and support. Identify exclusions, provisional quantities, third-party dependencies and any approvals that must be verified for the project.

4. Agree handover before work begins

List the drawings, labels, asset schedules, configuration backups, test results, warranty documents and operator instructions the owner needs. Name the person who will accept each deliverable.

5. Choose assessment or tender review

If the condition or scope is uncertain, start with an infrastructure assessment. If drawings, quantities and acceptance criteria are established, send an RFQ or tender reference for a scoped proposal.

Scope of work

Scope of work

Site address and marked-up drawings
System list and available BOQ
Existing asset and test records
User capacity and operational constraints
Target dates and access windows
Budget range and decision process

Operating environments

OwnersConsultantsMain contractorsProcurement teamsFacilities teamsIT and security teams

Questions before you specify

Questions before you specify

What does the ict & elv project planning checklist scope include?

The scope can include site address and marked-up drawings; system list and available boq; existing asset and test records; user capacity and operational constraints; target dates and access windows; budget range and decision process. Final inclusions depend on the site survey, design and agreed proposal.

What should I send to request a proposal?

Send the site location, drawings or bill of quantities (BOQ), existing-system information, project stage, indicative budget and target date. Identify any live operations or restricted access. FOSS can discuss an assessment when the scope is not yet defined.