Continuity must be demonstrated
A secondary route only helps when its carrier, power and network dependencies are understood. Define the failure cases first, then test which services remain available and how normal operation is restored.
04 / Plan for disrupted connections
Coordinate voice migration across branches, campuses and operational sites. FOSS infrastructure planning and selected M5 gateways and SBCs connect local requirements to a shared continuity plan.
FOSS combines M5 voice technology with fiber, data centers, AI CCTV and telecom security integration. From requirements and configuration to commissioning and handover, your UAE project has a local point of contact.
Mediatrix gateways and Sentinel session border controllers, selected for the interfaces, calling platform and capacity your project needs.
Start with your locations, existing telephone system, endpoint quantities and migration goal. The proposal defines equipment, licences, integration, acceptance tests and support. Carrier services and Microsoft licences are identified separately.
A secondary route only helps when its carrier, power and network dependencies are understood. Define the failure cases first, then test which services remain available and how normal operation is restored.
Scope of work
No universal zero-downtime promise is made. The design and proposal define recovery targets, dependencies, test conditions and the limits of each site’s architecture.
Yes. A representative pilot can validate interfaces and operating procedures before the same design is adapted to the remaining sites.