Abu Dhabi Airports: airport-wide fiber network

FOSS’s corporate presentation records a major fiber-network contract awarded in March 2015 to connect existing Abu Dhabi airport terminals with the then-planned Midfield Terminal.

The infrastructure need

Connect existing airport terminals to a new terminal programme through a resilient fiber backbone, with redundant connections to campus data centers.

The FOSS scope described

The presentation describes design and installation of the airport-wide fiber network, including single-mode fiber cabling and intelligent patching. It identifies Abu Dhabi Airports Company (ADAC) as the project reference.

How to read the project figures

The figures come from a historical FOSS corporate presentation that discussed completion as imminent in February 2017. They describe the scope reported at that time and are not presented here as independently verified as-built quantities or a current project status.

Relevant to your next project

Use this reference to discuss network resilience, terminal interfaces, cable capacity, data-center connections and phased acceptance. Ask FOSS for the project evidence relevant to your tender and the proposed delivery team.

Scope of work

Scope of work

Resilient single-mode fiber backbone
Connections between existing terminals and the new terminal programme
Redundant links to nine campus data centers
Intelligent patching and infrastructure management

Operating environments

AirportsCampus fiber networksData center connectivity

Questions before you specify

Questions before you specify

Is this the same as an illustrative use case?

No. This page summarizes a project reference recorded in FOSS’s supplied corporate presentation. The separate use cases describe possible project scenarios.

Are the historical dates a current delivery commitment?

No. They describe the original presentation. A new project requires its own survey, design, programme, acceptance criteria and agreed proposal.